Aperture Holdings required a high-performance, LEED-certified workspace on an aggressive timeline, constrained by a complex urban site and loading logistics. The project demanded precise planning to eliminate uncertainty.
Advanced parametric modeling and performance simulation optimized the tower's form and systems, achieving superior energy efficiency while maintaining architectural intent.
A slender, elegant form that responds to wind loads and solar exposure while maximizing views and natural light.
MEP systems and structural elements are seamlessly integrated through early-stage coordination, reducing floor-to-floor height and maximizing usable space.
Begin the brief for your next project, or schedule a consultation with our team.
[ START A PROJECT ]