Aperture Holdings required a high-performance, LEED-certified workspace on an aggressive timeline, constrained by a complex urban site and loading logistics. The project demanded precise planning to eliminate uncertainty.
Integrated BIM coordination across multiple trades eliminated field conflicts before construction, enabling faster installation and reducing change orders by thirty percent.
A vertical integration of retail, office, and residential spaces connected by a central atrium that maximizes natural light and circulation.
Thoughtful material selection and massing respond to the neighborhood context while establishing a distinct architectural identity.
Begin the brief for your next project, or schedule a consultation with our team.
[ START A PROJECT ]