Aperture Holdings required a high-performance, LEED-certified workspace on an aggressive timeline, constrained by a complex urban site and loading logistics. The project demanded precise planning to eliminate uncertainty.
Componentized delivery strategies and kitting streamlined site logistics, minimizing congestion and improving throughput.
A systematized envelope driven by thermal and maintenance requirements.
Optimized material families reduced waste without sacrificing performance.
Begin the brief for your next project, or schedule a consultation with our team.
[ START A PROJECT ]